Capital Improvement Project


Seismic Upgrades and Improvements Phase 5 - R9A & R16 AND VFD and Fire Pump Additions at S16 & S17

Estimated Construction Schedule: Slated to begin July, 2024 and is anticipated to be completed September, 2026.
Construction Contract Amount: Pending
Project ID #: 2212
Description: Reservoirs 9A and 16 have numerous structural deficiencies including ringwall foundation instability, inadequate foundation reinforcing steel, insufficient anchorage embedment, excessive shell stresses in several shell courses and weak interior center support columns. While the operating water levels in each of the reservoirs should be reduced until the deficiencies are addressed, this is not currently being considered as fire protection capabilities for the areas served by the tanks would be compromised. Improvements to S16 and S17 will be made to improve firefighting capabilities and improve system redundancy.

Summer 2023: Reservoir 17 (R17) has been split off from this project to form its own project due to the potential for delays that may result from additional environmental efforts involved with the proposed communications pole.

Contacts:

Andrew Wilt
Associate Civil Engineer
City of Santa Rosa
(707)543-3878
awilt@srcity.org

Michael Mirich
Civil Engineering Tech III
City of Santa Rosa
+17074819395
MMirich@srcity.org

David Coleman
Consultant Design Engineer
Brelje and Race
707-636-3756
Coleman@brce.com
Click for larger image
Project Image

Note: All dates and times are subject to change.