Minor Work for Water Services Affected by the Tubbs Fire - Cat F
Estimated Construction Schedule: Slated to begin June, 2019 and is anticipated to be completed August, 2019. Construction Contract Amount: $128,310 Project ID #: 2240 |
Description:
Approximately 71 contaminated water service lines at 54 locations were replaced by the Water Department outside of the advisory area in the spring of 2018. The Contractor will return to those locations to perform some additional work that could not be performed by City Crews. The Contractor will replace the existing meter box in kind and install 1 in. Polyethylene coated copper tubing to approximately 12 in. behind the sidewalk to connect to in the future. The contractor will also be replacing the sidewalk at this location. If there is no existing sidewalk, the 1 in. Polyethylene coated copper will be extended to approximately 12 in. beyond the water meter box.
|
|
Contacts: Anjali Mathews City of Santa Rosa SMathews@srcity.org APB GENERAL ENGINEERING Phone: (925) 989-1453 Correspondence: Project Bid Summary Imminent Construction Notice-English Imminent Construction Notice-Spanish |
Click for larger image |