Dotti Farm Recycled Water Pipeline Improvements
Estimated Construction Schedule: Slated to begin April, 2024 and is anticipated to be completed July, 2024. Construction Contract Amount: Pending Project ID #: 2259 |
Description:
This project will install a 12" diameter recycled water main connection from the existing 42" LEDS" recycled water main located at the Brown Pond Pump Station to the existing 14" pipe that feeds the Dotti Farm Pump Station located approximately 1,300 feet north in Llano Road. In addition, this project will reconfigure the above ground piping of the Dotti pump station and lower the existing vertical turbine pump motor to ground level for ease of operation and maintenance.
2024: Project is on HOLD and likely will be cancelled due to re-prioritization. |
|
Contacts: Andrew Wilt Associate Civil Engineer City of Santa Rosa (707)543-3878 awilt@srcity.org Michael Mirich Civil Engineering Tech III City of Santa Rosa +17074819395 MMirich@srcity.org David Coleman Consultant Design Engineer Brelje and Race 707-636-3756 Coleman@brce.com Correspondence: Advance Project Notice - English Advance Project Notice - Spanish |
Click for larger image |