Dotti Farm Recycled Water Pipeline Improvements

Estimated Construction Schedule: Slated to begin April, 2024 and is anticipated to be completed July, 2024.
Construction Contract Amount: Pending
Project ID #: 2259
Description: This project will install a 12" diameter recycled water main connection from the existing 42" LEDS" recycled water main located at the Brown Pond Pump Station to the existing 14" pipe that feeds the Dotti Farm Pump Station located approximately 1,300 feet north in Llano Road. In addition, this project will reconfigure the above ground piping of the Dotti pump station and lower the existing vertical turbine pump motor to ground level for ease of operation and maintenance.

2024: Project is on HOLD and likely will be cancelled due to re-prioritization.

Contacts:

Andrew Wilt
Associate Civil Engineer
City of Santa Rosa
(707)543-3878
awilt@srcity.org

Michael Mirich
Civil Engineering Tech III
City of Santa Rosa
+17074819395
MMirich@srcity.org

David Coleman
Consultant Design Engineer
Brelje and Race
707-636-3756
Coleman@brce.com

Correspondence:
Advance Project Notice - English
Advance Project Notice - Spanish
Click for larger image
Project Image

Note: All dates and times are subject to change.