Northerly Slope Protection Delta Pond
Estimated Construction Schedule: Slated to begin July, 2020 and is anticipated to be completed December, 2021. Construction Contract Amount: $2,974,452 Project ID #: 2271 |
Description:
Wave action from wind and storm events have caused significant erosion benches on the northerly slope of reclaimed water Delta pond. The project consists of rehabilitating approximately 5,200 linear feet of Delta Pond northerly embankment and installation of a coffer dam. Rehabilitation method consists of excavating and compacting approximately 2.5 ft. of the slope embankment and placing approximately 1 ft. of rock rip rap over geotextile to protect the embankment from wave erosion and vegetation.
|
|
Contacts: Andrew Wilt Associate Civil Engineer City of Santa Rosa (707)543-3878 awilt@srcity.org Michael Mirich Civil Engineering Tech III City of Santa Rosa +1 (707) 481-9395 MMirich@srcity.org Ben Bryant Consultant Project Manager Brelje and Race 707-636-3747 bryant@brce.com Other Information: C02271 Invitation for Bids (for information only – see PlanetBids for bidding) C02271 Bid Results |
Click for larger image |