Delta Pond Slope Protection

Estimated Construction Schedule: Slated to begin August, 2020 and is anticipated to be completed October, 2023.
Construction Contract Amount: Pending
Project ID #: 2271
Description: Wave action from wind and storm events have caused significant erosion benches on the northerly slope of reclaimed water Delta pond. The project consists of rehabilitating approximately 5,200 linear feet of Delta Pond northerly embankment and installation of a coffer dam. Rehabilitation method consists of excavating and compacting approximately 2.5 ft. of the slope embankment and placing approximately 1 ft. of rock rip rap over geotextile to protect the embankment from wave erosion and vegetation.
Contacts:

Andrew Wilt
Associate Civil Engineer
City of Santa Rosa
(707)543-3878
awilt@srcity.org

Michael Mirich
Civil Engineering Tech III
City of Santa Rosa

MMirich@srcity.org
Click for larger image
Project Image

Note: All dates and times are subject to change.