West College Storage Facility Pumping Improvements
Estimated Construction Schedule: Slated to begin August, 2020 and is anticipated to be completed October, 2020. Construction Contract Amount: Pending Project ID #: 2284 |
Description: West College Wet Weather Facility storage basins allow the City to temporarily divert storm flows from the local system in order to balance flows in the Laguna Treatment Plant during winter storm events. Currently, the City rents two trailer mounted diesel powered, vacuum assisted pumps and places them in position at the West College Storage Facility. The City plans to purchase two mobile pumps of similar capacity in lieu of renting and desires to construct permanent facilities to house and operate the pumps including a pad (with built-in containment), roof cover and connection to existing bypass piping. | |
Contacts: Andrew Wilt Associate Civil Engineer City of Santa Rosa (707)543-3878 awilt@srcity.org Michael Mirich Civil Engineering Tech III City of Santa Rosa +1 (707) 481-9395 MMirich@srcity.org Dave Coleman Consultant Design Engineer Brelje and Race 707) 636-3756 coleman@BRCE.com |
Click for larger image![]() |