West College Storage Facility Pumping Improvements
Estimated Construction Schedule: Slated to begin February, 2022 and is anticipated to be completed March, 2024. Construction Contract Amount: $966,481 Project ID #: 2284 |
Description: West College Wet Weather Facility storage basins allow the City to temporarily divert storm flows from the local system in order to balance flows in the Laguna Treatment Plant during winter storm events. Currently, the City rents two trailer mounted diesel powered, vacuum assisted pumps and places them in position at the West College Storage Facility. The City plans to purchase two mobile pumps of similar capacity in lieu of renting and desires to construct permanent facilities to house and operate the pumps including a pad (with built-in containment), roof cover and connection to existing bypass piping. Additionally, a containment structure will be constructed for the disinfection chemicals at the West College Pump Station near the West College Recycled Water Pond. | |
Contacts: Richela Maeda Associate Civil Engineer City of Santa Rosa (707)543-3812 rmaeda@srcity.org Michael Mirich Civil Engineering Tech III City of Santa Rosa +17074819395 MMirich@srcity.org Dave Coleman Consultant Design Engineer Brelje and Race 707) 636-3756 coleman@BRCE.com Correspondence: C02284 Invitation for Bids (for information only-see PlanetBids for bidding) C02284-Plans (for information only-see PlanetBids for bidding) C02284 Bid Tab |
Click for larger image |