Traffic Signalization at Hearn Ave at Burbank Ave
Estimated Construction Schedule: Schedule for this project is not set. Construction Contract Amount: Pending Project ID #: 2319 |
Description: Project will install a four-way traffic signal, with 2 traffic poles with mast arms, 6 signal traffic pole, Opticom (video cameras) on all four approaches, pedestrian crossings on the south and east legs, lane striping, advanced loop detection east and west of the intersection on Hearn Ave. A proposed traffic signal will increase the traffic handling capacity of the intersection and will improve the safety & efficiency of both pedestrian and vehicular traffic. The project will improve access to Southwest Park for pedestrians and vehicles. | |
Contacts: Michael Vanmidde Associate Traffic Engineer City of Santa Rosa (707)543-3819 MVanMidde@srcity.org Correspondence: Invitation for Bids - for information only, see PlanetBids for bidding Bid Tabs |