Laguna Treatment Plant Digester 2 Reroof
Estimated Construction Schedule: Slated to begin September, 2020 and is anticipated to be completed November, 2020. Construction Contract Amount: $214,000 Project ID #: 2320 |
Description: The floating roof cover on Digester 2 was constructed in the mid 1970s and is near the end of its useful life. This roofing replacement project is intended to extend the life of the floating cover until a fixed cover is installed by a future project. | |
Contacts: Andrew Wilt Associate Civil Engineer City of Santa Rosa (707)543-3878 awilt@srcity.org Jerry Winterlin Civil Engineering Tech III City of Santa Rosa +1 (707) 953-0877 JWinterlin@srcity.org Colin Casey Consultant Design Engineer Brown and Caldwell 916.712.9324 CCasey@brwncald.com Other Information: C02320 Bid Tab C02320 Bid Tab |