B St and 3rd St SB Right Hand Turn Pocket Improvements
Estimated Construction Schedule: Schedule for this project is not set. Construction Contract Amount: Pending Project ID #: 2408 |
Description: Installation of a right hand turn pocket in the south bound direction of B St at the 3rd St intersection. The project will include grading and relocation of utilities (water, SD, electrical) within the pocket area, replacement of 2 traffic poles and curb/gutter system. The new pocket area will also include sidewalk reconstruction and installation of 2 directional ADA ramps. The finished asphalt and crosswalk will be stamped & painted to match the other B St intersections. | |
Contacts: Peter Porata Assistant Engineer City of Santa Rosa (707)543-3865 pporata@srcity.org |