Armory Drive Storm Drain Realignment
Estimated Construction Schedule: Slated to begin December, 2024 and is anticipated to be completed January, 2025. Construction Contract Amount: Pending Project ID #: 2442 |
Description: In preparation for the future Bike & Pedestrian Overcrossing Project C0769, approximately 60 linear feet of existing 30 inch storm drain pipe will need to be relocated in order to avoid conflict with PG&E electrical infrastructure being installed to accommodate the Overcrossing project. | |
Contacts: Jose Mederos Baltazar Assistant Engineer City of Santa Rosa (707)543-3915 JMederos@srcity.org Arturo Rodriguez Civil Engineering Tech III City of Santa Rosa +1 (707) 387-2550 ARodriguez@srcity.org |