New Radio Links Connecting Reservoirs & Pump Stations
Estimated Construction Schedule: Slated to begin September, 2025 and is anticipated to be completed September, 2026. Construction Contract Amount: Pending Project ID #: 2506 |
| Description: This project will replace the existing obsolete radio telemetry system serving the water distribution system. Radios transmit water reservoir condition information to pump stations that supply them with water. Connecting the reservoirs to the pump stations via radio will become the primary communications link, with the leased telephone lines serving as backups. This will add redundancy to communication and contribute to a more resilient system. | |
|
Contacts: Tracy Duenas Supervising Engineer City of Santa Rosa (707)543-3952 TDuenas@srcity.org |