Hearn Ave at Highway 101 - Phase 3 Rebuild Interchange
Estimated Construction Schedule: Slated to begin January, 2024 and is anticipated to be completed December, 2025. Construction Contract Amount: Pending Project ID #: 720 |
Description:
The US 101 Hearn Avenue Regional Multimodal Interchange Project (project) will demolish and reconstruct the Hearn Ave interchange overcrossing in the same location to increase vertical clearance over United States Highway (US) 101, widen the overcrossing to provide two vehicle lanes in each direction, a median, sidewalks, and Class II and Class IV bikeways that will extend to Corby Avenue and Santa Rosa Avenue. The project will also widen the southbound US 101 off-ramp with turning lanes at its intersection with Corby Avenue, add lanes at the intersections of Hearn Avenue/Corby Avenue and Hearn Avenue/Santa Rosa Avenue, and add pedestrian curb ramps and crosswalks that meet the requirements of the ADA and incorporate protection and detection to reduce conflicts between bikes and vehicles.
Additional News: Check out the following links for more information: https://www.srcity.org/746/Hearn-Avenue-Interchange-Phase-3 |
|
Contacts: Dezire Perez Barbante Associate Civil Engineer City of Santa Rosa (707)543-4203 dperez@srcity.org Other Information: C00720_BidSummary C00720_Plans C00720_Specifications
|
Click for larger image |