South Avenue Drainage Improvement
Estimated Construction Schedule: Schedule for this project is not set. Construction Contract Amount: Pending Project ID #: 2588 |
|
Description:
This project will improve the drainage issue caused by excessive surface water build up after heavy rains by installing a drop inlet in front of 555 South Avenue near the mailboxes with a 12" diameter RCP pipe, 70 lineal feet in length connect into the nearest catch basin to the east. The intent is to mitigate the ponding surface water through the new pipe and into the nearest drainage system.
|
|
|
Contacts: Danny Chen Assistant Engineer City of Santa Rosa (707)543-3911 DChen@srcity.org Robert Heaton Project Manager Nelson Construction (775)750-6644 rheaton1117@gmail.com Sam Martinez City Inspector City of Santa Rosa (707)543-3841 smartinez@srcity.org |