South Avenue Drainage Improvement

Estimated Construction Schedule: Schedule for this project is not set.
Construction Contract Amount: Pending
Project ID #: 2588
Description: This project will improve the drainage issue caused by excessive surface water build up after heavy rains by installing a drop inlet in front of 555 South Avenue near the mailboxes with a 12" diameter RCP pipe, 70 lineal feet in length connect into the nearest catch basin to the east. The intent is to mitigate the ponding surface water through the new pipe and into the nearest drainage system.

Construction Update Image

September 2026: This project has been awarded to Nelson Construction. It is slated to begin construction in mid September.

Contacts:

Danny Chen
Assistant Engineer
City of Santa Rosa
(707)543-3911
DChen@srcity.org

Robert Heaton
Project Manager
Nelson Construction
(775)750-6644
rheaton1117@gmail.com

Sam Martinez
City Inspector
City of Santa Rosa
(707)543-3841
smartinez@srcity.org
Click for larger image
Project Image

Note: All dates and times are subject to change.