Capital Improvement Project


Geysers - Delta Connection Improvements

Estimated Construction Schedule: Slated to begin August, 2022 and is anticipated to be completed November, 2024.
Construction Contract Amount: Pending
Project ID #: 2111
Description: Upsize approximately 130 linear feet of the existing 12" diameter connection between the Geysers Pipeline and Delta Pond to 24" diameter. This will allow high flows of recycled water to be delivered to Delta Pond using the Geysers pipeline as a redundant supply line to the reclamation piping network.

Construction Update Image

Fall 2024: Project is essentially complete except for the installation of one fixed cone valve on backorder. Contractor has reported manufacturer delays more approximately 1 year with the latest shipping date at the end of October.

Contacts:

Andrew Wilt
Associate Civil Engineer
City of Santa Rosa
(707)543-3878
awilt@srcity.org

Michael Mirich
Civil Engineering Tech III
City of Santa Rosa
+17074819395
MMirich@srcity.org

David Coleman
Consultant Design Engineer
Brelje and Race
707) 636-3756
coleman@brce.com

PIAZZA CONSTRUCTION
Phone: (707) 876-3410
Fax: (707) 876-3256

James Piazza
Owner
PIAZZA CONSTRUCTION
(707)876-3410
(707)484-1614
piazzapc@gmail.com

Joel Piazza
Project Manager
PIAZZA CONSTRUCTION
(707)876-3410
(707)591-1486
piazzapc02@gmail.com

Other Information:
Notice Of Completion And Environmental Document Transmittal
Notice of Intent to Adopt a Mitigated Negative Declaration
Santa Rosa Geyser Diffuser Improvements IS-MND
C02111 Invitation for Bids (for information only - see PlanetBids for bidding)
C02111 Plans (for information only - see PlantetBids for bidding)
Pre-Bid Roster
Bid Tabulation
Revised Bid Tabulation
Click for larger image
Project Image

Note: All dates and times are subject to change.