Geysers - Delta Connection Improvement
Estimated Construction Schedule: Slated to begin August, 2021 and is anticipated to be completed October, 2021. Construction Contract Amount: Pending Project ID #: 2111 |
Description: Upsize the connection between Delta Pond and the existing 33" Geysers Line which ends just outside the toe of the pond. The length need to be upsized is approximately 130 feet from 12" to approximately 24" to 33". Upsizing this connection will allow recycled water to be delivered to Delta Pond using the Geysers pipeline in the event that the aged reclamation piping network is compromised and will provide redundancy. | |
Contacts: Andrew Wilt Associate Civil Engineer City of Santa Rosa (707)543-3878 awilt@srcity.org Cy Penry Civil Engineering Tech III City of Santa Rosa +1 (707) 529-9210 CPenry@srcity.org David Coleman Consultant Design Engineer Brelje and Race 707) 636-3756 coleman@brce.com |