Llano Trunk-West Third St Brittain to Darla and Glenbrook Siphon Lining

Estimated Construction Schedule: Slated to begin June, 2020 and is anticipated to be completed October, 2020.
Construction Contract Amount: $5,781,255
Project ID #: 2285
Description: This project will rehabilitate approximately 3,800 feet of deteriorating reinforced concrete pipeline (RCP) with cured-in-place pipe (CIPP) lining inserted into the existing sewer main pipe, located on W. 3rd Street from Brittian Lane to Darla Drive. Seven manholes along the pipeline will be rehabilitated with a corrosion resistant epoxy liner for protection against future hydrogen sulfide deterioration. The project will also rehabilitate the Glenbrook Sewer Siphon with cured-in-place pipe (CIPP) lining inserted into the three largest barrels. The forth and smallest existing barrel will be abandoned. The two siphon structures will be rehabilitated with a polyurethane liner.

Project Update - June 2020: Construction contract was awarded to SAK Construction, LLC, of O'Fallon, Missouri.

Contacts:

David Fradelizio
Associate Civil Engineer
City of Santa Rosa
(707)543-3862
DFradelizio@srcity.org

Correspondence:
C02285 As Builts (for information only-see PlanetBids for bidding)
C02285 Invitation for Bids (for information only-see PlanetBids for bidding)
C02285 Plans (for information only-see PlanetBids for bidding)
Bid Tabs
Imminent Construction Notice-General English
Imminent Construction Notice-General Spanish
Imminent Construction Notice-Glenbrook English
Imminent Construction Notice-Glenbrook Spanish
Location Map - General
Location Map - Glenbrook
Imminent Construction Notice-Creek Trail English
Imminent Construction Notice-Creek Trail Spanish
Location Map North Santa Rosa Creek Trail
Click for larger image
Project Image

Note: All dates and times are subject to change.