Llano Trunk-West Third St Brittain to Darla and Glenbrook Siphon Lining
Estimated Construction Schedule: Slated to begin June, 2020 and is anticipated to be completed October, 2020. Construction Contract Amount: $5,781,255 Project ID #: 2285 |
Description:
This project will rehabilitate approximately 3,800 feet of deteriorating reinforced concrete pipeline (RCP) with cured-in-place pipe (CIPP) lining inserted into the existing sewer main pipe, located on W. 3rd Street from Brittian Lane to Darla Drive. Seven manholes along the pipeline will be rehabilitated with a corrosion resistant epoxy liner for protection against future hydrogen sulfide deterioration. The project will also rehabilitate the Glenbrook Sewer Siphon with cured-in-place pipe (CIPP) lining inserted into the three largest barrels. The forth and smallest existing barrel will be abandoned. The two siphon structures will be rehabilitated with a polyurethane liner.
Project Update - June 2020: Construction contract was awarded to SAK Construction, LLC, of O'Fallon, Missouri. |
|
Contacts: David Fradelizio Associate Civil Engineer City of Santa Rosa (707)543-3862 DFradelizio@srcity.org Correspondence: C02285 As Builts (for information only-see PlanetBids for bidding) C02285 Invitation for Bids (for information only-see PlanetBids for bidding) C02285 Plans (for information only-see PlanetBids for bidding) Bid Tabs Imminent Construction Notice-General English Imminent Construction Notice-General Spanish Imminent Construction Notice-Glenbrook English Imminent Construction Notice-Glenbrook Spanish Location Map - General Location Map - Glenbrook Imminent Construction Notice-Creek Trail English Imminent Construction Notice-Creek Trail Spanish Location Map North Santa Rosa Creek Trail |
Click for larger image![]() |