Water Pump Station 9 Electrical Upgrades
Estimated Construction Schedule: Slated to begin November, 2025 and is anticipated to be completed December, 2026. Construction Contract Amount: Pending Project ID #: 2438 |
|
Description:
This project will make improvements to critical power supply infrastructure, allowing this water pump station to be powered with a portable generator. These improvements include a mechanically-interlocked Portable Generator breaker and 800 AMP portable generator connection. This would allow the operation of two pumps at the station using a large enough portable generator. There is not currently any safe method for attaching a portable generator to Pump Station 9. This project will also facilitate future maintenance of the facility by installing a PG&E disconnect.
|
|
|
Contacts: Andrew Wilt Associate Civil Engineer City of Santa Rosa (707)543-3878 awilt@srcity.org Carlos Solorzano Civil Engineering Tech III City of Santa Rosa +17077874728 csolorzano@srcity.org Ben Bryant Consultant Project Manager Brelje and Race 707-636-3747 bryant@brce.com Sophia Grubb Consultant Construction Manager Brelje & Race 707-636-3737 grubb@brce.com Other Information: C02438 Invitation for Bids (for information only - see Planetbids for bidding) C02438 Plans C02438 Bid Tab |
Click for larger image
|