City of Santa Rosa image CIP

Capital Improvement Project


Water Pump Station 9 Electrical Upgrades

Estimated Construction Schedule: Slated to begin November, 2025 and is anticipated to be completed December, 2026.
Construction Contract Amount: Pending
Project ID #: 2438
Description: This project will make improvements to critical power supply infrastructure, allowing this water pump station to be powered with a portable generator. These improvements include a mechanically-interlocked Portable Generator breaker and 800 AMP portable generator connection. This would allow the operation of two pumps at the station using a large enough portable generator. There is not currently any safe method for attaching a portable generator to Pump Station 9. This project will also facilitate future maintenance of the facility by installing a PG&E disconnect.

Construction Update Image

Nov - Dec 2025: Construction activity anticipated to begin in November or December 2025.

Contacts:

Andrew Wilt
Associate Civil Engineer
City of Santa Rosa
(707)543-3878
awilt@srcity.org

Carlos Solorzano
Civil Engineering Tech III
City of Santa Rosa
+17077874728
csolorzano@srcity.org

Ben Bryant
Consultant Project Manager
Brelje and Race
707-636-3747
bryant@brce.com

Sophia Grubb
Consultant Construction Manager
Brelje & Race
707-636-3737
grubb@brce.com

Other Information:
C02438 Invitation for Bids (for information only - see Planetbids for bidding)
C02438 Plans
C02438 Bid Tab
Click for larger image
Project Image

Note: All dates and times are subject to change.