Capital Improvement Project


Slater St Water and Sewer Replacement - Dexter to Lewis and Lewrosa Way

Estimated Construction Schedule: Slated to begin May, 2021 and is anticipated to be completed November, 2021.
Construction Contract Amount: Pending
Project ID #: 189
Description: This project will replace aged water main and sewer main in Lewrosa Way and in Slater Street from Lewis Road to Dexter Street. Upsizing the water mains will improve fire flow and reduce maintenance costs. Replacing older deteriorated VCP pipe reduces inflow and infiltration and reduces maintenance costs.The pavement will be reconstructed along Slater Street between Lewis Road and Dexter Street and in Lewrosa Way once mains have been replaced. Nine existing curb ramps will also be replaced. Potholing will be taking place in February 2021 to locate existing utilities in the project area. This information is for design purposes at this stage. Please drive carefully and watch for warning signs where they are conducting potholing activities.
Contacts:

Sara Mathews
Assistant Engineer
City of Santa Rosa
(707)543-3866
SMathews@srcity.org
Click for larger image
Project Image

Note: All dates and times are subject to change.