Slope Protection on Northerly Slopes of Ponds C, D, and Delta

Estimated Construction Schedule: Slated to begin June, 2018 and is anticipated to be completed November, 2020.
Construction Contract Amount: Pending
Project ID #: 1909
Description: The northerly slopes of Delta Pond, and Ponds C and D, need protection from further erosion created by wave action from storm events. Evaluation of placing rock slope protection in a band above and below the ponds operating surfaces, rather than from the toe of the pond, will be investigated and considered to reduce project costs.

August 2017: Design at early stages.