Los Alamos Trunk Sewer Replacement Segment 1 (Streamside Dr to Elaine Dr)
Estimated Construction Schedule: Slated to begin May, 2023 and is anticipated to be completed February, 2025. Construction Contract Amount: Pending Project ID #: 1903 |
Description:
This project will replace approximately 5300 linear feet of the existing Los Alamos Trunk sewer that was installed in the 1950s that is undersized and in poor condition. The new trunk sewer will be 24-inches in diameter and will generally be installed adjacent to the existing alignment between Streamside Dr and Elaine Dr through private property and along Mission Circle and Quigg Dr. An above-ground sewer bypass system will be installed for short durations at certain locations before being relocated as it follows the construction progress along the alignment. To minimize both public and business impacts, a portion of the work along Mission Circle is conditioned night work and the proposed water improvements serving 4920 and 4934 HWY 12 are conditioned weekend work.
|
|
Contacts: Andrew Wilt Associate Civil Engineer City of Santa Rosa (707)543-3878 awilt@srcity.org Dave Keck Quality Control Associate City of Santa Rosa +1 (707) 481-4312 dkeck@srcity.org Mike Janet Consultant Construction Manager Coastland 707-494-6464 janet@dccm.com Ben Bryant, PE Consultant Design Engineer Brelje and Race 707-576-1322 Bryant@brce.com TEAM GHILOTTI INC. Phone: (707) 763-8700 Fax: (707) 763-8711 Matt Verke Contractor Superintendent TEAM GHILOTTI INC. (707)763-8700 mattv@teamghilotti.com Joe Moreira Contractor Project Manager TEAM GHILOTTI INC. (707)763-8700 Correspondence: Initial Study and Mitigated Negative Declaration Advance Project Notice - English Advance Project Notice - Spanish Geotechnical Information Report C01903 Invitation for Bids (for information only-see PlanetBids for bidding) Los Alamos Trunk Sewer Initial Study C01903 Plans (for information only-see PlanetBids for bidding) Tree Survey Report Bid Tabs Imminent Construction Notice - English Imminent Construction Notice - Spanish Other Information: Report - Biological Resources - Phase 1 Biological Resources - Phases 2, 3, and 4 Report - Cultural Resources - Phase 1 Cultural Resources - Phases 2, 3, and 4 Geotechnical Report - Overall Geotechnical Report- Phase 1 Tree Survey - Phase 1 |
Click for larger image |