NOTE: The list of public facilities improvement projects shown below contains projects that have completed the necessary budgetary and environmental approval process, as well as those proposed for construction. Appearance of a project on this list does not constitute final approval of any project. Each project is subject to environmental and engineering review to be conducted in accordance with the applicable requirements of the California Environmental Quality Act (CEQA), and City Code provisions. To find out about a few Recreation & Parks projects not listed here, visit www.srcity.org/parks.
Click a Project ID in the table below to see the project web-page report.
Filtered by Projects with Bicycle Component
Click a column header to turn on sorting. |
Year/Month. |
| Status | ProjID | Title | Description | Est Start | Est End |
|---|---|---|---|---|---|
Proposed | 00769 | Route 101 Bicycle and Pedestrian Overcrossing | The Project will construct a 14.5-foot wide ADA compliant Class I bicycle & pedestrian overcrossing over US-101. The Project includes a 5-foot wide walking lane and 8-foot wide bike path. The Project will close a significant gap in the east-west transportation network for pedestrians and bicyclists. The selected alignment will construct the overcrossing over US-101 along the Edwards Avenue and Elliott Avenue corridor, adjacent to the Santa Rosa Junior College campus. | 2026/03 | 2028/03 |
Proposed | 01102 | Santa Rosa Creek Trail Access at N. Dutton Ave (West Side) | This project will install a bicycle and pedestrian access that meets the ADA standards from Dutton Avenue on the west side to the multi-use pathway along Santa Rosa Creek. | N/A | N/A |
Proposed | 01178 | Fulton Rd from Guerneville Rd to Piner Rd - Widen to Four Lanes | The purpose of this project is to ease future traffic congestion. Fulton Road will be reconstructed and widened to 4 lanes with bike lanes and sidewalks between Guerneville Road and Piner Road. The Project includes PG&E Rule 20A underground district, roller compact paving, 2 travel lines in each direction, widen sidewalk, bike lanes, median islands and storm drain improvements. | 2022/04 | 2024/12 |
Proposed | 02263 | Calistoga Rd Reconstruction- Montecito Blvd to Highway 12 | The Calistoga Road Reconstruction project will rehabilitate approximately 1.1 center line miles of Calistoga Road using a combination of Full Depth Reclamation and mill and fill paving methodologies to address failing and deteriorating pavement conditions. Associated improvements will include adding buffered and protected bike lanes in select locations while maintaining existing Class II bike lanes in all other locations, updated bus stop infrastructure, and upgrading pedestrian curb ramps to current ADA standards. In addition to the roadway rehabilitation work, the project will include select water and sewer system infrastructure improvements on the order of approximately 4,850 LF of water pipe replacement/upsizing and 1,500 LF of sewer pipe replacement. | 2026/05 | 2027/07 |
Proposed | 02283 | Santa Rosa Ave at Bellevue Ave Traffic Signal | This project is slated to improve the existing intersection at Santa Rosa Avenue and Bellevue Avenue from a 2-way stop sign to a 4-way traffic signal as well implement a protected intersection design. Associated improvements include, but are not limited to adding a pedestrian crossing along the south end of the intersection and updating curb ramps to current ADA standards. | N/A | N/A |
Proposed | 02406 | Hopper Ave Corridor Fire Recovery Improvements | This project will rehabilitate the Hopper Ave corridor between Coffey Ln and the Hwy 101 on ramp as a result of the damage caused by the 2017 Tubbs Fire. Improvements will include the addition of bike lanes, medians, landscape, pedestrian crossings, bulb outs a HAWK signal, utility realignment, sidewalk improvements, and new striping. Visit www.SRCity.org/EnvisionHopper for additional project details. | 2026/05 | 2027/02 |
Construction | 02412 | Hearn Community Hub - Phase 1 | The City has acquired an approximately 6-acre property at 976, 980 and 1004 Hearn Avenue for the Hearn Community Hub - Fire Station, Library, Cultural Center, Aquatic Center, Dutton Avenue Extension and Multi-use path. Project funding has required the project be phased. Phase 1 will include site improvements, the Fire Station and the Multicultural Library. | 2025/09 | 2027/12 |
Construction | 02496 | 2025 Pavement Preventative Maintenance | This project will perform various pavement improvements to City streets including, crack sealing, localized asphalt repair, pavement resurfacing and striping reconfigurations. Street priorities are established by the City's Pavement Management System, with a majority of work occurring in the City's North-West Quadrant area for the 2025 project. Pavement maintenance restores the pavement's ability to prevent water intrusion, corrects minor cracking and improves skid resistance. | 2025/09 | 2025/11 |